REPRESENTATIVE PROJECTS
KEY Engineering Associates (KEY) has been involved in a broad range of civil engineering projects over the past 35 years. A description of representative track and field, wastewater treatment, and other substantial projects is provided. Project details are available upon request.


Play Fields, Tracks, and Wastewater Projects
KEY has designed the following types of play fields, tracks, and wastewater projects:
Play Fields:
-
Over 20 synthetic turf football/soccer fields
-
Synthetic turf softball field
-
Synthetic turf play areas
Tracks:
-
8-lane 400-meter rubber-surfaced tracks
-
6-lane to 8-lane track conversions
Domestic Wastewater:
-
Wastewater treatment plant (WWTP) projects
-
WWTP facility permit renewals
-
Wastewater pump station or lift station projects
-
Gravity sewer collection systems
-
Wastewater force main
-
Inflow and infiltration (I/I) investigations
Other Substantial Projects
-
Synthetic turf football/soccer fields & 8-lane rubber tracks at over 20 public schools in the Tampa Bay area
-
Site drainage improvements, parent pickup loop, driveway/parking lot, lift station, & WWTP projects for numerous Hillsborough County Public Schools
-
Frozen Grove WWTP expansion to 965,000 gpd in Lake County
-
Design & permitting for new 260,000 gpd WWTP for Oak Stone in DeSoto County
-
New 125,000 gpd WWTP for Sailfish Point Utilities in Martin County
-
Structural design of WWTP improvement projects throughout Florida
-
New well and well pumps for St. Leo University
-
Precast and cast-in-place concrete tank design services for Marolf in Pasco County
-
Master pump station for the Florida State Fairgrounds in Tampa

